Misbakhul Munir
QA/QC Inspector at PT. Indonesian Marine
Indonesia
Summary :
More than six years worked at the one of the biggest electronic company make me well understand about:
- How to manage, lead and motivated a team of QC inspector to achieve the quality requirement and perform line balancing to ensure work done effectively and efficiency.
- Preparation of cost/proposal summary of business plan including manpower, equipment and calibrations schedule.
- Coordinate testing method in accordance to existing testing method and interfacing work with related department for method of assembly.
- Generates testing report and analysis the result for every qualification project.
Specialties :
Project management, Fault tree analysis, FMEA, GR&R, SPC, Reliability test performance, AutoCAD, Web Development
Jobs
QA/QC Inspector
PT. Indonesian Marine
(Oil & Energy industry)
May 2010 - Present (5 months)
o To establish and implement the necessary procedures to provide a satisfactory and efficient documentation control system for the control and management of all Project documents
o Establishing and maintaining a document filing system
o Planning and controlling the document flow to/from internal and external parties including the Client.
o Issue all documents and drawings, originate and verify transmittals, verify receipt of the documents issued, record the issuing data, monitor and maintain these records
o Maintenance and control of specifications
o Maintenance and upkeep of relevant document control procedures Applicable to the Project and revisions thereof
o Ensure that obsolete/superseded Quality Documents are identified and removed from all areas of distribution and use.
o Receipt of MDRs from suppliers and their safe maintenance.
Development Engineer
Panasonic Shikoku electronic Batam
(Electrical/Electronic Manufacturing industry)
December 2006 - January 2010 (3 years 2 months)
- Coordinate with other related section to achieved the goal our production.
- Hold the Awareness (AQ) meeting with the support of Development group for every new model that is going to run in Batam factory.
- Attend customers meeting including conference meeting and Ensure all customer specifications are being been properly understand among QA and production members.
- Ensure all latest drawing & B.O.M are issued and received by other departments.
- Follow-up on Engineering change documents and specification. Support production on the failure encounter during Engineering Sample and Pre Production stage and provide corrective action.
- Provide Engineering Sample & Pre-Production schedule planning work together with Customer Support Group, PC, and Production & Sales department.
Reliability Test Engineer
Panasonic Shikoku electronic Batam
(Electrical/Electronic Manufacturing industry)
July 2004 - November 2006 (2 years 5 months)
- Plan schedule, perform and track reliability tests. Perform Electrical testing, interpret and summarize test results. Interpret Reliability data and improve product quality and reliability.
- Support the installation, setup and maintenance of reliability equipment. And report to QA Manager and lead a team of 2 QC engineers, 2 assistance process engineers & 12 QC operators.
Development Engineer
PT. KIT Mechatronic
(Electrical/Electronic Manufacturing industry)
August 2003 - June 2004 (11 months)
- Main job to Develop all production process include man power, material, machine, method and handle new model project, process control namely identify and improvement process
- Investigate and resolving quality problem, Material testing of packaging materials and data applications.
- Co-ordinate and quality product testing activities to meet customer’s requirement to release to production.
- Comply process and product with reference standard, quality plan and document instruction.
- Improvement line, reduce loss time, man power with combine process, reduce defective and Making sample for new model project.
Education
Offshore Technology Institute Batam
Piping Process ASME B31.3
2010 - 2010
Scope and Definition of ASME B31.3, Material, Standart for Piping Components, Piping design, PID, Isometric, Fabrication Assembly and Erection, Inspection Examination and testing, Hydrostatic and Pneumatic testing
IKBAL M YOS Batam
Welding Inspector
2006 - 2009
Universitas Diponegoro
Mechanical engineering
1997 - 2002
WebSites
Copyright 2009 LinkedIn Corporation. All rights reserved
Popularity: 5%




